GSE specialises in construction projects for logistics and industrial buildings and data centres.

Engineering and construction group GSE is celebrating a milestone: this year marks half a century since it was founded in France. The company pioneered the general contractor model, which combines design and turnkey construction with a single point of contact. Over the years, it has built twenty-three million square metres of industrial and commercial properties across Europe.

 

Operating in Spain since 1998, GSE has delivered projects across a wide range of sectors, with milestones including Europe’s first logistics facility to achieve Leed v4 platinum certification, a project built for Merlin Properties in Azuqueca de Henares (Guadalajara) and commissioned in 2021. With offices in Madrid and Barcelona, its team offers a comprehensive service for industrial, logistics and data centre projects.

 

   

 

What has GSE’s trajectory been like in Spain?

After more than twenty-five years in Spain, I believe we are entering one of the most promising periods for GSE. For many years, our business has been closely linked to logistics development, a sector to which we have brought our group’s extensive expertise. We have now strengthened our presence in industrial projects and are successfully expanding into data centres, two markets in which we are achieving significant growth. Joining the German group Goldbeck in 2019 also marked a turning point, enabling us to strengthen our capabilities and leverage new synergies across Europe. The market is moving towards increasingly complex facilities, with more demanding technical and operational requirements. And that is where we see a clear opportunity: we have the experience, the teams and the backing of a major European group to support that evolution.

 

What is your customer profile in Spain?

We have two main types of client. On the one hand, property developers and investors who develop logistics and industrial assets. On the other, companies that need new facilities to develop or expand their own operations, from manufacturers to digital infrastructure operators. In both cases, they key is to understand what they need. Building a distribution hub is not the same as building an industrial plant, where the production process shapes much of the building’s design. That is why we seek to get involved from the earliest stages and understand both the current and future needs of each facility.

 

What have been your most significant projects?

In Spain, we have projects that clearly demonstrate our track record. One of the standouts is the logistics hub we built for Merlin Properties in Azuqueca de Henares (Guadalajara), a pioneering facility in Europe at the time, covering around 100,000 m2 and holding Leed v4 platinum certification. In the industrial sector, I would highlight the Palfinger project in Vicálvaro (Madrid), a complex that integrates various operational activities of the company. More recently, our involvement in a new data centre near Barcelona offers a clear example of our growth in this sector. The initial plans for the campus envisage a capacity of sixty megawatts. Although these are different projects, they all reflect something we consider essential: the ability to adapt our expertise to the needs of each client and market.

 

What have been your major investments?

Our primary focus has been to strengthen GSE Iberia’s structure and capabilities. We are bringing in talent and specialists to enable us to take on larger, more complex projects. For us, growth is not just about increasing the volume of activity, but about having the right teams in place to support our clients from the initial phase through to the handover of their facilities.

 

You offer a multidisciplinary service that has already become widespread across the sector. What sets you apart from your competitors?

I believe the difference lies in what we can bring to a project before construction begins. Our Design & Build model integrates design, engineering and construction from the outset. This enables us to assess alternatives, anticipate challenges and make decisions that directly affect project costs, timelines and quality. We also have a significant advantage: we can combine the proximity and knowledge of a local team with the skills and experience of professionals from across Europe. This combination is particularly valuable when we work on facilities with a high degree of technical complexity. It is also worth highlighting that we are the only group able to support our clients anywhere in Europe.

 

How many employees do you have in Spain and what are their profiles?

We currently have a team of 45 professionals at GSE Iberia (Spain and Portugal), forming part of GSE’s workforce of approximately eight hundred employees. The Goldbeck group has around seven thousand employees. Our team consists primarily of individuals with technical backgrounds (engineering, architecture, business development, project management and construction), alongside support functions. This breadth of expertise, combined with access to the group’s specialist resources, enables us to undertake projects of different types and scales.

 

How important is Spain for the company’s strategy?

Spain, together with Portugal, is a strategic market for GSE’s growth. We are seeing how the reshaping of supply chains, new industrial investment and the development of digital infrastructure are transforming business needs. Spain offers highly favourable conditions for attracting international investment: a strategic geographical location, a strong industrial base and opportunities to develop new production and technology facilities. Our ambition is to support that growth, particularly through larger, more complex projects, by leveraging our capabilities both in Iberia and across the wider group.

 

What are the main challenges facing the commercial property sector?

One of the biggest challenges is the increasingly technically demanding nature of projects, while at the same time, clients need to get their facilities up and running within very tight timeframes. This calls for a different way of working. We cannot wait until construction is under way to resolve issues that should have been anticipated at the design stage. Coordination across disciplines, planning and the ability to anticipate are essential. Of course, sustainability and energy efficiency are integral to these requirements, not only in our projects but also as a core part of GSE’s mindset. That is why we have held Ecovadis certification for years and have achieved platinum status, placing us among the top 1% of companies for sustainability awareness. We also hold B-Corp certification, an internationally recognised trademark that acknowledges companies who meet the highest standards in social and environmental performance, transparency and ethics. Regarding our projects, we pioneered certification to standards such as Leed and Breeam, and we use the most advanced digital tools to improve project coordination and development. Ultimately, our challenge is to give clients certainty: to enable them to take their investments forward with the right technical solutions, realistic timescales and rigorous cost control, and with an approach that gives them access to sustainable projects while incorporating social responsibility - a key consideration for current and future investments.

 

Photos: GSE